New Construction of a Footpath/Cycleway Along Landstrasse 1177 and 1134, Mönsheim
The municipality of Mönsheim implemented the closure of the gap in the existing footpath/cycle path network between Wurmberg and Mönsheim. The planning as well as the construction work was carried out in two construction phases. The planning was carried out by our engineering office.
The first construction phase (length approx. 525 m) runs between the existing state road L1177 and the existing noise barrier embankment of the "Gödelmann II" residential area. The second construction phase (length approx. 490 m) is located between the Lidl supermarket in the Appenberg district and the Appenberghalle parking lot along the state roads L1177 and L1134. In the course of the preliminary planning of the second construction phase, several route options were examined.
As part of the second construction phase, the laying of pipe bracings was also planned by our office on behalf of the Zweckverband Breitbandversorgung im Enzkreis.
Eckdaten
Planning traffic facilities (LPH 1-8)
Special services:
On-site construction supervision
Length: approx. 1,015 m