New Warehouse/Administration Building Wörwag, Korntal-Münchingen
Wörwag Immobilien GmbH constructed a new warehouse with an adjoining office building, an underground car park and a truck delivery area with a sunken yard in the Korntal industrial area, north of Kornwestheimer Straße, in a first construction phase.
The architectural office Gurk took over the planning of the buildings in this project, our engineering office the planning of the drainage as well as the traffic and open spaces.
The drainage is carried out in a separate system with a connection to Kornwestheimer Straße. Rainwater retention was required for the surface water. The traffic facilities had to be designed for truck traffic. In the northwestern area, delivery takes place via a sunken yard. South of the administration building with underground parking, an open space with recreational opportunities for employees was planned. The green areas were planned including planting. The entire first construction phase was enclosed with a 2 m high fence and 2 entrance gates on the east and west sides.
Eckdaten
Planning drainage (LPH 1-8)
Planning rainwater retention and detention (LPH 1-8)
Planning open spaces (LPH 1-8)
Planning traffic facilities (LPH 1-8)
Special services:
On-site construction supervision
1st construction phase:
- Net building land: approx. 11,290 m²
- of which approx. 4,710 m² traffic area approx. 830 m² open space area approx. 1,395 m² green areas
- 75 m storage sewer DN 2000
- 170 m wastewater sewer DN 300-400
- 240 m stormwater sewer DN 300-500