Redevelopment Haldenstraße, Baltmannsweiler


The municipality of Baltmannsweiler planned the comprehensive redevelopment of Haldenstraße from Reichenbacher Straße to Karlstraße over a length of approximately 170 m. The planned renovation area is located south of the town center and borders Karlstraße to the east and Reichenbacher Straße to the west. The construction project involved earthworks, civil engineering and road construction works as well as pipe delivery and pipe laying works. Access to the construction site was via Reichenbacher Straße from the west and Karlstraße from the east. Delivery traffic had to be ensured as far as possible.

The conversion of Reichenbacher Straße in the junction area with Haldenstraße was carried out with half-lane closure and traffic light control. The necessary areas had to be kept clear for individual traffic. Access routes (e.g. for the fire brigade, emergency services) and building entrances had to be kept clear and accessible at all times. It should be noted that there was a kindergarten at Haldenstraße 22 (east of the renovation area), which could be reached on foot from the town center via Haldenstraße. Access and entrance to the kindergarten had to be kept clear at all times. Work at the intersection of Halden-/Karlstraße therefore had to be carried out during kindergarten holidays.

Since the road was being comprehensively renovated due to the damage to the roadway and we assume a service life of at least another 30 to 40 years after the renovation, it was very important to also consider the pipes in the roadway area. Based on the results of the EKVO, the sewer was classified into damage classes requiring renovation (damage class 0 and 1) and was renewed using open construction methods. The water pipe dates from 1938 and had to be repaired several times in recent years due to numerous pipe bursts. Therefore, it was decided with the municipal administration to also renew the water pipe including the house connection pipes as part of this measure.

Eckdaten


Auftraggeber
Municipality of Baltmannsweiler, 73666 Baltmannsweiler
Leistungen
  • Planning combined sewer (LPH 1-3, 5-8)

  • Planning water supply (LPH 1-3, 5-8)

  • Planning traffic facilities (LPH 1-3, 5-8)

  • Special services:

    • On-site construction supervision

    • Utility coordination

    • SiGeKo

    • Road marking and signage

    • Review of change orders and alternative bids

    • Design surveying

Fakten

Mischwasserkanal DN300 (ca. 70 m), DN400 (ca. 100 m), DN500 (ca. 10 m)
Wasserleitung - Hauptleitung DN100 GGG (ca. 170 m), neue Hausanschlüsse Württemberger System, Neubau Schachthydranten 2,0 m x 2,0 m (2 Stück),
Verkehrsanlagen - Neubau Asphaltflächen ca. 1000 m², Granitbordsteine ca. 360 m, Neubau der Straßenbeleuchtung

Zeitraum
08/2014 – 12/2015
Kosten

k.A.