Sewer Rehabilitation in Closed Construction, Gingen an der Fils
The municipality of Gingen planned the rehabilitation of existing sewers in Ebereschenweg, Ulmenweg and Birkenweg and commissioned our company with the planning, tendering and construction implementation of the measure. The sewer rehabilitation included the installation of GRP pipe liners DN 300 in 12 sewer stops, the integration of approximately 75 lateral connections using sewer robots and the rehabilitation of manhole channels. Furthermore, a drainage control concept was developed. The project was processed and controlled by our certified sewer rehabilitation consultant. The measure was completed on time and without defects in October 2019 and the specified budget was completely adhered to. The sewer rehabilitation work was carried out by Aarsleff Rohrsanierung GmbH, Stuttgart branch.
Eckdaten
Planning sewer rehabilitation (LPH 1-8)
Special services:
On-site construction supervision
Review of change orders
Preparation of drainage control concept
On-site inventory assessments
- Installation of GRP pipe liner DN 300 in 12 sewer stops (approx. 450 m).
- Integration of approx. 75 lateral connections using sewer robots.
- Rehabilitation of manhole channels.