Completion of sewer rehabilitation in Gingen an der Fils

Sewer rehabilitation in closed construction

The engineering office Fritz Spieth was commissioned by the municipality of Gingen with the planning, tendering and constructional implementation of the sewer rehabilitation. The measure was completed on time and without defects in October 2019 and the cost framework was completely adhered to.

Thanks to forward-looking budget planning on the part of the municipality and correspondingly adequate deadlines for the construction work, it was possible to achieve an economical tender result.

The sewer rehabilitation comprised the installation of DN 300 GRP pipe liners in 12 sewer stops (approx. 450 m) as well as the integration of approx. 75 lateral connections using sewer robots. Furthermore, the manhole channels had to be rehabilitated.

The project comprised the work phases 1 to 8 as well as the local construction supervision, which were processed and controlled by our certified sewer rehabilitation consultant. The sewer rehabilitation work was carried out by the company Aarsleff Rohrsanierung GmbH, Stuttgart branch.