Development of the residential area "Gödelmann II" , Mönsheim

Project description

The municipality of Mönsheim realised the development of the building area Gödelmann II with a total area of approx. 3.4 ha and a net building area of approx. 1.65 ha north of the existing building area Gödelmann I. The municipality of Mönsheim commissioned KBB GmbH with the development of the building area. The development planning was carried out by the engineering office Fritz Spieth. The new residential area had a longitudinal extension of approx. 270 m and a width extension of approx. 100 m in the east and approx. 140 m in the west.

The drainage was carried out in a modified combined system with a near-natural earth basin with a volume of approx. 260 m³ and a meandering drainage ditch. Along the L 1127, a noise barrier was constructed over a length of approx. 520 m in the form of a planted embankment with a noise barrier on top. In addition, a cycle path was planned along the L 1177 on behalf of the municipality of Mönsheim. The implementation was scheduled for 2017/2018.

ib-spieth-mönsheim-1

Our achievements in this project

Consulting

Studies / Concepts

Planning LPH 1 - 4

Planning LPH 5 - 7

Site management / Local supervision Construction Supervis.

Project management

Project data

Production costs:
Total costs: n.a.

Key data:
Total area: approx. 3.4 ha

Period of performance:
2014 - 2018

Client:

  • KBB GmbH, 76532 Baden-Baden, Germany