New construction of a footpath/cycleway along Landstrasse 1177 and 1134, Mönsheim
The municipality of Mönsheim closed the gap in the existing network of footpaths and cycle paths between Wurmberg and Mönsheim. The planning and construction work was carried out in two construction phases. The planning was carried out by our engineering office.
The first construction phase (length approx. 525 m) runs between the existing road L1177 and the existing noise barrier of the residential area "Gödelmann II". The second construction phase (length approx. 490 m) is located between the Lidl supermarket in the Appenberg district and the car park of the Appenberghalle along the L1177 and L1134 roads. In the course of the preliminary planning of the second construction phase, several routes were examined.
Within the scope of the second construction phase, our office also planned the laying of pipe bracings on behalf of the Zweckverband Breitbandversorgung im Enzkreis (broadband supply association in the Enz district).
Consulting
Studies / Concepts
Planning LPH 1 - 4
Planning LPH 5 - 7
Site management / Local supervision Construction Supervis.
Project management
Production costs:
Total costs: approx. EUR 416,000 net (excl. laying of pipe bracing).
Key data:
Length: approx. 1,015 m
Performance period:
2015 - 2019
Client: