Loading...

Planning of a hydrogen pipeline between Albbruck and Dogern

Project description

badenovaNETZE GmbH planned the construction of an approx. 9 kilometre long gas pipeline for hydrogen (H2) near Albbruck and Dogern. Here, the hydrogen is produced by a 50 MW electrolysis plant and taken over by the producer after the pressure increase. The DN 250 hydrogen pipeline has an operating pressure of 70 bar and will transport 8,000 tonnes of hydrogen per year.

The pipeline route, which was planned by engineering firm Firtz Spieth, is intended to connect industrial operations and a hydrogen refuelling station. In the initial planning phases, the routing and possible variants were analysed and then transferred to the design planning stage.

The technical challenges in this project included laying the pipeline in a section along the banks of the Rhine, crossing the Alb using a pipeline bridge, several trenchless crossings of the B34, two crossings of the DB railway tracks and 6 water crossings.

 

 

[Translate to English:] Wasserstoff-Trasse zwischen Albbruck und Dogern

Our achievements in this project

CONSULTING

Studies / CONCEPTS

PLANNING LPH 1 – 4

PLANNING LPH 5 – 7

SITE MANAGEMENT / LOCAL SUPERVISION CONSTRUCTION SUPERVIS.

PROJECT MANAGEMENT

PROJECT DATA

Production costs:

Key data:

Pressure: DP70 - MOP 70 bar
Diameter: DN250
Length: abt. 9.000 m buried in the ground
Gas production volume: 8.000 t/year

Period of performance:
Routing: 09/2023 - 10/2023

Draft planning: 11/2023 - 12/2023

Approval: 1 quarter 2024

Implementation: 2 quarter 2024

Client:

  • badenovaNETZE GmbH, 79108 Freiburg im Breisgau